Penetrant Testing · Process Control

Developer QA Check

← Exercise Hub
This week's check
Step 1 of 4

Dry powder — condition check

Why this testAfter drying, the part goes into a cloud of this fine white powder. It clings to the surface and works like blotting paper — wicking penetrant back out of any crack and spreading it wide enough to see. That only works if the powder is bone-dry and fluffy, so it dusts into a light, even coat. Moisture — humid air, a lid left open, a damp part — cakes it into lumps that can't coat evenly, and a spot the powder misses develops nothing.
Turn the sample over next to the reference — how does the powder behave?

UV speck test — dragged-in penetrant

Why this testEvery glowing speck is a grain of powder soaked in penetrant — carried in by parts that went into the chamber before they were fully dry. In service, one of those grains can land on a clean part and glow like a real crack: a false indication that wastes inspection time or scraps a good part. So the procedure caps them: no more than 10 specks inside the 100 mm circle.
Count the fluorescent specks inside the marked circle (specks outside it don't count):

Aqueous developer — hydrometer

Why this testThe dip tank is developer powder dissolved in water, and everything depends on concentration — too dilute and the dried film is too thin to pull penetrant out of tight cracks. You can't see concentration, but you can weigh it: more dissolved solids make the liquid denser, and the hydrometer floats higher in a denser liquid. So the number on the stem at the surface line — the specific gravity — stands in for concentration.
Read the stem scale at the liquid surface line:

Disposition — what goes in the QA log?

Making the callReadings don't protect parts — dispositions do. Put this week's three results — powder condition, speck count, specific gravity — against their limits and decide what the log says.

QA log

Your checks

WeekWhat was really going onPowderReadingsDisposition
Process Control · Materials QA

Will the developer still do its job?

The developer is the last material a part sees — it draws penetrant back out of defects and makes the indication visible. Two forms, two simple checks. Each step opens with a short note on why the test exists — read it first, then make the check.